India using 10,000-12,000 MW of power in 9 minutes


During the 9-minute lights out on 5 April, about 10,000-12,000 MW of power demand is expected to vanish, Power System Operation Corporation Ltd (POSOCO), the national load despatch centre doesn’t have adequate electricity storage mechanisms

Popular posts from this blog

228 Indian players will take part in the Olympics, which is the highest ever for the country.

Do you know from Today 10 PSU Banks to be Merged?

GST revenue grows 3.8% in FY20 to Rs12.2 trillion

Is Modi created disaster?

Is 49-day lockdown necessary to stop coronavirus resurgence?