India using 10,000-12,000 MW of power in 9 minutes
During the 9-minute lights out on 5 April, about 10,000-12,000 MW of power demand is expected to vanish, Power System Operation Corporation Ltd (POSOCO), the national load despatch centre doesn’t have adequate electricity storage mechanisms