India using 10,000-12,000 MW of power in 9 minutes


During the 9-minute lights out on 5 April, about 10,000-12,000 MW of power demand is expected to vanish, Power System Operation Corporation Ltd (POSOCO), the national load despatch centre doesn’t have adequate electricity storage mechanisms

Popular posts from this blog

How many Tea's you drink in a day?

Do you know from Today 10 PSU Banks to be Merged?